Installation of Solar PV panels.
The initial meeting with the solar engineer went well. The engineer explained the various systems and what could be expected, typical installation time and all other necessary steps.
The installation was carried out professionally over a two day period by all trades (scaffolding, electrical ). .
Customer in
Guisborough, 13 November 2014
- Verified by phone call